Step 1 / 5
Start with the building.
- Collect current by-laws and renovation procedures.
- Get written answers for your proposed work.
More guidance
Ask the body corporate manager or committee for current by-laws, renovation procedures and any forms used for proposed work. Describe the changes plainly: surfaces, fixtures, flooring, walls, plumbing and electrical work. Identify whether the plan could affect common property, even when the new finish sits inside your lot. Record the person who can answer questions and the time the building needs to review a proposal.
Queensland's body corporate guidance says lot owners should consider common-property effects and applicable by-laws. It also notes that some schemes have flooring approval rules. Approval depends on the work and the scheme; do not assume either that every internal renovation needs the same approval or that an internal room is automatically exempt. Obtain the relevant answer in writing for your plan.
Internal work can still affect common property or by-laws. Check the proposed scope with building management.
Step 2 / 5
Walk the whole route.
- Check loading, lift size and booking rules.
- Allow for protection, delivery and waste removal.
- Agree who books access with building management.
More guidance
Measure the path from loading area to apartment door. Check parking, lift dimensions and booking rules, stair access, protected surfaces, permitted delivery times and where materials can wait. Plan how old cabinetry, tiles and packaging leave the site. A short walk with the contractor often reveals a constraint that a floor plan cannot show.
Ask who books the lift, arranges any required protection and talks to building management. Agree where trades can enter and how they will secure the apartment. Keep a copy of access instructions with the job documents so deliveries and waste removal follow the same plan as the installation.
Loading area to your room
- Loading & parkingDelivery times & waste collection
- Lift or stairsDimensions, bookings & protection
- Common hallwayClearance & protected surfaces
- Apartment doorDoor width & secure access
Step 4 / 5
Plan life around the work.
- Check work hours, noise rules and notice requirements.
- Agree on dust protection and common-area cleaning.
- Nominate a contact for changes and interruptions.
More guidance
Check the building's work hours and noise rules. Ask how notice should be given to nearby residents and who handles unexpected interruptions. Discuss dust containment, common-area cleaning and temporary water or power interruptions before the job is scheduled. If the apartment will be occupied, decide where daily essentials can remain and how the room will be separated from living space.
Create a small contact list: owner, contractor, building manager and an emergency contact. Agree who updates the building when deliveries, noisy work or access dates change. A clear process helps residents understand what is happening without promising an exact finish date before the scope and approvals are settled.
Step 5 / 5
Keep the essentials together.
- Bring your proposed scope and room photos.
- Include written building responses and access details.
- Flag unresolved decisions before work is scheduled.
More guidance
Put the proposed scope, room photos, marked-up layout, product choices, building instructions, written responses, access plan and contact list in one place. Flag unresolved decisions rather than hiding them in a quote. Ask the contractor to confirm what the scope includes, who supplies each item, and how changes will be agreed if site conditions differ. That pack makes the first inspection useful and gives everyone a shared reference before work begins.
Your inspection checklist